Pepper Hamilton Law
Pittsburgh, PA | 2015
GC: Moore & Morford Inc., Greensburg, PA
This expansive glass handrail allowed the tenant to seamlessly occupy floors in the BNY Mellon Center building. Installation materials included:
- ½” clear tempered glass
- Top and bottom glass shoes.
- Cladded in oil rubbed bronze
St. Clair Hospital
McMurray, PA | 2013
GC: Moore & Morford Inc., Greensburg, PA
This 2 story handrail included ½” clear tempered glass that was mounted directly to the stair stringer by cylindrical stainless steel stand-offs. Precision was critical. We performed all of the design and layout for:
- The standoff attachment to the stairs, which corresponded to the hole layout in the glass.
- The fabrication and installation of the stainless steel handrail.
- As each hole drilled into the glass has almost no tolerance for error, the design and fabrication elements were extremely difficult.
ANH Refractories Fitout
Pittsburgh, PA | 2014
GC: Continental Building Systems, Pittsburgh, PA
This interior office fitout featured glass systems by Sadev. Project highlights include:
- MAPG installed over 3,500 sq ft of sliding “barn doors” at offices
- Also installed 150 sq ft of standard swinging all glass doors
- Each of the doors were constructed out of ½” clear tempered glass and brushed stainless steel cladding
- Each door also was installed with a locking ladder pull handle.